Transformasi Infrastruktur Kendaraan Listrik di Indonesia Image

Indonesia is preparing to embrace the era of electric vehicles (EVs), with the government and private sector collaborating to expand charging infrastructure across various regions. Public Electric Vehicle Charging Stations (SPKLU) are now available in major cities such as Jakarta, Bandung, Surabaya, and Bali. Fast-charging technology, which allows batteries to charge up to 80% in just 30-40 minutes, has been introduced to address range anxiety. This initiative supports Indonesia’s target to achieve net-zero emissions by 2060. 

In addition to government efforts, the private sector plays a significant role in supporting EV infrastructure. Many shopping centers, hotels, and office buildings now provide charging facilities, while some vehicle manufacturers offer home charging options for consumers. Despite rapid advancements, challenges such as unequal access to electricity in certain areas and the high cost of infrastructure development remain obstacles that require cross-sector collaboration. 

The future of electric vehicles in Indonesia appears promising, with the integration of renewable energy sources such as solar and wind power into charging systems. Government policies, including EV purchase incentives and supportive regulations for SPKLU development, further strengthen this ecosystem. Through these strategic steps, Indonesia has the potential to become a leader in EV adoption in Southeast Asia while making a significant contribution to global efforts to combat climate change.

 

Source: MGmoto.com


Related Post

Navigating Property in 2025: Challenges, Trends, and New Opportunities

Navigating Property in 2025: Challenges, Trends, and New Opportunities

The Impact of the Whoosh Station in Karawang on Property

The Impact of the Whoosh Station in Karawang on Property

The Karawang Station for the High-Speed Train has been operational since December 24, 2024, and is located just 10 minut

The Karawang Station for the High-Speed Train has been operational since December 24, 2024, and is located just 10 minut